It was a wet day back in May when the back yard was dug up for the garage foundation.

The start of the footings and foundation forms.
Forms all ready for the concrete.
A few friends to help pour the concrete.
Concrete poured and 7 cubic yards of gravel waiting to be shovelled. The first of 2 piles that had to be moved. Oh what fun!!!
Poured the garage floor in July after some of the walls were up. Concrete was supposed to arrive at 8 am but the day before a plant shut down caused a change of plans and it couldn't arrive till 1pm. It turned out to be a hot day and made for a bit of a tense pour. Thank goodness the driver was awesome and stepped in to give a hand.
Rowyn checking out the new floor!
Walls are up and the roof is in place. Building inspectors Gryffin and Rowyn checking out the quality of work. They both approve.
![]() |
The garage door is on and we're now trying to finish up all the little details so that the siding can start going on.